API RP 12R1 PDF

Find the most up-to-date version of API RP 12R1 at Engineering Production Service. API RECOMMENDED PRACTICE 12R1. FIFTH EDITION, AUGUST EFFECTIVE DATE: OCTOBER 1, American. If you have any questions or comments regarding API standards, please visit RP 12R1. Recommended Practice for Setting, Maintenance, Inspection.

Author: Gardakasa Dogami
Country: Netherlands
Language: English (Spanish)
Genre: Life
Published (Last): 10 March 2015
Pages: 380
PDF File Size: 19.86 Mb
ePub File Size: 16.94 Mb
ISBN: 911-4-94998-209-7
Downloads: 30033
Price: Free* [*Free Regsitration Required]
Uploader: Shasho

As part of those efforts, the BLM also anticipates that it will separately propose 122r1 regulations to update and replace Onshore Oil and Gas Orders Nos. Digital Transformation may be defined in a number of different ways by analysts or enterprise software vendors. This proposed rule would establish the minimum standards for accurate measurement and proper reporting of all gas removed or sold from Federal and Indian leases 12e1 the Osage Tribeunits, unit participating areas, and areas subject to communitization agreements, by providing a system for production accountability by operators, lessees, purchasers, and transporters.

Spec 12F, Shop Welded Tanks for Storage of Production Liquids, 11th Edition, November Covers material, design, and construction requirements for vertical, cylindrical, aboveground, shop-welded steel tanks in nominal capacities of 90 to bbl in standard sizes for production service.

New Products – more.

American Petroleum Institute – Recommended Standards and Practices

Specific equipment covered by this specification includes end and outlet connectors; ring gaskets; chokes; valves including surface and underwater safety valves; actuators; and wellhead and Christmas tree equipment examples: Red Flag This Post Please let us know here why this post is inappropriate. Process of manufacture; chemical and mechanical property requirements; methods of testing; and dimensions are included. Spec 12D, Field Welded Tanks for Storage of Production Liquids, 10th Edition, November Covers material, design, fabrication, and erection requirements for vertical, cylindrical, aboveground, welded steel tanks in nominal capacities of to wpi, bbl in standard sizes for production service.

The changes proposed as part of this proposed rule would allow the BLM to strengthen its policies governing production verification 112r1 accountability by updating Order 3’s requirements to address changes in technology and industry practices that have occurred in the 25 years since 12g1 3 was issued, and to respond to recommendations made by the Government Accountability Office GAO with respect to the BLM’s production verification efforts.

The incorporation by reference IBR of certain publications listed in the rule is approved by the Director of the Federal Register as of January 17, Send your comments on this proposed rule to the BLM on or tp November 30, Download Now Defense manufacturing is all about project manufacturing and project accounting. This document corrects several minor errors that were 1r21 by the Office of the Federal Register during formatting, as well as one erroneous cross-reference, in the text of the final rule.

  AGUTI YACHTS PDF

Summary On February 8,the Bureau of Land Management BLM published in the Federal Register a proposed rule that aip reduce waste of natural gas from venting, flaring, and leaks during oil and natural gas production activities on onshore Federal and Indian leases.

Send your comments on this proposed rule to the BLM on qpi before April 8, The tests outlined in this publication are used to evaluate the critical performance properties of thread compounds under laboratory conditions. Sign In or Register. It provides a system for production accountability by operators, lessees, purchasers, and transporters.

43 CFR 3174.5 – Oil measurement by tank gauging – general requirements.

Finally, it sets forth a process for the BLM to consider variances from the requirements of this proposed regulation. As explained later, the BLM is also requesting that the Office of Management and Budget OMB extend the control number for the 24 information collection activities that would continue in this proposed rule. Thickness a;i Tank Elements thread Forum.

Purchase includes yearly addenda to the current edition of the standard.

The Bureau of Land Management BLM is proposing new regulations to reduce waste of natural gas from venting, flaring, and leaks during oil and natural gas production activities on onshore Federal and Indian leases. Like Order 5, this rule establishes minimum standards for accurate measurement and proper reporting of all gas removed or sold from Federal and Indian pr the Osage Tribe leases, units, unit participating areas PAsand areas subject to communitization agreements CAs.

API | Annual Standards Plan

Am I missing something or are they poorly written? Send your comments on this proposed rule to the BLM on or before April 23, As explained later, the changes that follow would establish proposed new information collection requirements that must be approved by OMB.

Therefore, a comment to OMB on the proposed information collection 1r1 is best assured of being considered if OMB receives it by August 12, The incorporation by reference of certain publications listed in the rule is approved by the Director of the Federal Register as of January 17, On February 8,the Bureau of Land Management BLM published in the Federal Register a proposed rule that would reduce waste of natural gas from venting, flaring, and leaks during oil and natural gas production activities on onshore Federal and Indian leases.

  ARVO PART SOLFEGGIO PDF

Therefore, a 12rr1 to the OMB on the proposed information collection requirements is best assured of having its full xpi if the OMB receives it by October 30, These proposed regulations would be codified at new 43 CFR subparts and Posting Guidelines Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Resources Digital Transformation may be defined in a number of different ways by analysts or enterprise software vendors. StdWelded Steel Tanks for Oil Storage, 10th Edition, October Covers material, design, fabrication, erection, and testing requirements for aboveground, vertical, cylindrical, closed- and open-top, welded steel storage tanks in various sizes and capacities.

Includes a new section on flare gas recovery. The proposed rule also identifies certain acts of noncompliance that would result in an immediate assessment.

Send your comments on this proposed rule to the BLM on or before September 11, This rule also identifies certain specific acts of noncompliance that may result in an immediate assessment and provides a process for the Bureau of Land Management BLM to consider variances from the requirements of this rule. This litigation has been consolidated and is now pending in the U. Title 43 published on Oct Join your peers on the Internet’s largest technical engineering professional community.

Suggested solutions to the immediate design and economic and safety problems involved in pressure-relieving discharge systems are presented. Your cart is empty. Spec 12P, Fiberglass Reinforced Plastic Tanks, 2nd Edition, January Covers minimum requirements for material, design, fabrication, and testing of fiberglass reinforced plastic tanks. If you wish to comment on the information collection requirements in this proposed rule, please note that the OMB is required to make a decision concerning the collection of information contained in this proposed rule between 30 and 60 days after publication of this proposed rule in the Federal Register.